Works related to the construction of the project are in progress. In the lower part the sixth floor is being sealed, while in the height part a concrete mix is being placed over the last office floor.  Since last week masonry works are ongoing on the level of underground parking garages.  A temporary passenger lift has been extended, thanks to which you can reach the 12th floor.

At present a fragment of an elevation mock-up of different widths of razors has been made. From the eastern side, a trial window mock-up was assembled. Finish samples of the slurry walls were made on the garage level.